Skip to content
Heat Pump and Installation
an independent guide
The project
▾
How a heat pump is installed
Four stages, with the dates the grant sets
The heat-loss survey
What it measures and how it sets the size
Radiators and cylinder
What changes inside the house
Commissioning and handover
The papers you should be given
Ground source installation
Trenches, boreholes and the six-month voucher
After a boiler breakdown
The routes, and where the risk sits
Costs and dates
▾
Installation cost and planner
Official medians by size, and your own dates
Prices quarter by quarter
What the official figures show since late 2025
Where the figures come from
How the official costs are collected
Rules and siting
▾
Planning permission
The Class G test in England
Where the outdoor unit can go
Walls, roofs, boundaries and access
Electrics and the network operator
Notify, or apply first
Replacing a gas boiler
What comes out and what goes in
Replacing storage heaters
Building a wet system from scratch
Reference
▾
Installation questions
Glossary
Installation checklist
All guides
About this guide
Contact
Ask a question
Home
The project
How a heat pump is installed
The heat-loss survey
Radiators and cylinder
Commissioning and handover
Ground source installation
After a boiler breakdown
Costs and dates
Installation cost and planner
Prices quarter by quarter
Where the figures come from
Rules and siting
Planning permission
Where the outdoor unit can go
Electrics and the network operator
Replacing a gas boiler
Replacing storage heaters
Reference
Installation questions
Glossary
Installation checklist
All guides
About this guide
Contact
Ask a question →
Site map
Every page on this guide, grouped the way the menu groups them.
The project
How a heat pump is installed
The heat-loss survey
Radiators and cylinder
Commissioning and handover
Ground source installation
After a boiler breakdown
Costs and dates
Installation cost and planner
Prices quarter by quarter
Where the figures come from
Rules and siting
Planning permission
Where the outdoor unit can go
Electrics and the network operator
Replacing a gas boiler
Replacing storage heaters
Reference
Installation questions
Glossary
Installation checklist
All guides
About this guide
Contact
This site
Home
Ask a question
Accessibility
Privacy
Terms
More guides
After a boiler breakdown
Replacing storage heaters
Installation checklist
Ask a question
Ask a question