1. Survey
  2. Design
  3. Fit
  4. Commission
  5. Costs
  6. Rules

Independent installation guide

The heat-loss survey for a heat pump

The survey is where the price and the running of the system are decided. What it measures, how it turns into a size in kilowatts, and the figures to hold on to.

Figures checked 3 November 2026Sources at the foot of the pagePublished by SEO-DONS LTD, an independent guide

Most of the money in a heat pump installation is committed at the survey. The size of the unit, how many radiators change, how big the cylinder is and how warm the water has to run all follow from one set of measurements. A good survey makes the rest of the project predictable; a rushed one leaves you paying for guesses.

What the survey measures

A heat-loss survey asks a simple question about every room: how much heat leaks out of it on a cold day, and so how much has to be put back in to keep it warm? The answer depends on:

  • Walls: what they are built from, whether they have cavity or solid construction, and whether they are insulated.
  • Windows and doors: their area and how many panes of glass they have.
  • Roof and floors: loft insulation, rooms in the roof, suspended timber or solid floors.
  • Air leaks and ventilation: chimneys, vents and draughts that let warm air escape.
  • The temperature wanted in each room, and the outdoor temperature the system is designed to cope with.
Diagram of a house losing heat through walls, windows, roof and floors and air leaks; added up at the design outdoor temperature this gives the heat demand in kilowatts.
Installers certified by MCS design to MIS 3005-D, the heat pump design standard.

The surveyor measures rooms and windows, notes how the house is built and insulated, and looks at the existing radiators. MCS certified installers design to MCS's heat pump design standard, MIS 3005-D, which MCS republished as version 2.0 in December 2025.

From heat loss to the size of the heat pump

Each room's heat loss is a figure in watts. Added together for the whole house, at the design outdoor temperature, they give the heat demand in kilowatts. That is the output the heat pump has to supply on a cold day, and it is what the size on your quote should match.

Getting this right matters both ways. A unit that is too small cannot keep the house warm on the coldest days. One that is too big costs more to buy, as the official prices by size show, and can switch on and off more than it should. The aim is a unit matched to the calculated demand, which is why the calculation itself is worth seeing.

The sizes people actually end up with

DESNZ publishes how many grant-funded air source heat pumps were installed in each size band. Of the 30,516 counted for April 2025 to March 2026, 54% were 6 to 10 kW, 15% were under 6 kW and 18% were 12 kW or more. The median size in July to September 2026 was 8 kW, and half of all installs fell between 6 kW and 10.2 kW.

Grant-funded air source installs by size, April 2025 to March 2026 (DESNZ Table A1.3A)
SizeInstalls countedShareMedian price
Under 4 kW2390.8%£11,992
4 to 6 kW4,20413.8%£11,494
6 to 8 kW8,03026.3%£12,164
8 to 10 kW8,50527.9%£12,688
10 to 12 kW3,97813%£13,948
12 to 14 kW2,8249.3%£15,366
14 to 16 kW1,2364.1%£15,498
16 to 18 kW9563.1%£14,817
18 to 20 kW900.3%£17,878
20 kW or more4541.5%£24,177

These figures say what is common, not what your house needs. A large, older detached house can need far more than the median; a small, well-insulated flat far less. The point of the survey is to replace the average with your own number. The cost planner shows what each size band costs.

The design flow temperature

The second number the survey sets is the temperature of the water sent round the radiators on the coldest day: the design flow temperature. A heat pump works more efficiently the cooler that water can be. But cooler water gives off less heat from the same radiator, so a lower flow temperature usually means some radiators must be larger.

This is the trade-off at the heart of the design. The installer balances the flow temperature against the radiator changes the house can take. The choice affects both what you pay now and how the system runs later, so the flow temperature should be written on the design, not left as a setting to decide on the day. Our page on radiators and the cylinder follows that trade-off through to the work in each room.

What to get in writing

Ask for the survey's results as a document, not a verbal summary. A complete set usually includes:

  1. Heat loss room by room, in watts, with the indoor temperature assumed for each room.
  2. The total heat demand and the outdoor design temperature it was calculated for.
  3. The heat pump's size in kW, and the model if it has been chosen.
  4. The design flow temperature.
  5. A radiator schedule: each room's existing radiator, whether it is big enough at that flow temperature, and what replaces it if not.
  6. The cylinder: its size and where it will go.

With these in hand, you can check that the quote prices the job that was designed, and you have the figures a second installer needs to quote on the same basis.

On the day of the survey

A survey takes the surveyor round every room. It helps to have to hand anything you know about the house: when insulation was added, which walls are solid, recent window replacements, and where the stopcock, consumer unit and current boiler are. Show them where you would and would not want the outdoor unit and the cylinder, because both are design decisions with planning and space consequences.

It is also a good moment to ask about the parts of the project that depend on the house rather than the heat pump: whether the electricity supply is likely to need attention, how the pipes would get from the unit to the heating, and whether any planning check applies. The installation stages page shows where each of those fits in the timetable.

Survey questions

Is an energy performance certificate enough to size a heat pump?

No. An EPC estimates the whole home's energy use for a rating; it does not say how much heat each room loses on a cold day or which radiators are big enough. Since 28 April 2026 the grant no longer needs an EPC at all, so the survey is where the real numbers come from.

Should I pay for the survey separately?

Practice varies between installers. Whatever the arrangement, ask whether the heat-loss figures will be handed to you, so you can share them with another installer if you want a second quote.

What if two installers come up with different sizes?

Ask each for the total heat loss they calculated and the design flow temperature. A different size usually traces back to a different heat-loss figure; once you can see both calculations, the gap normally has a reason you can follow.

What is the largest heat pump the grant covers?

The scheme covers individual systems up to 45 kWth. Very few homes come near that: the median air source heat pump installed in July to September 2026 was 8 kW.

Where this page's figures come from

  1. MCS, MIS 3005-D heat pump design standard update
  2. DESNZ, Boiler Upgrade Scheme statistics September 2026 (Tables Q1.1A and A1.3A)
  3. GOV.UK, Boiler Upgrade Scheme: what you can get (capacity limits)
  4. legislation.gov.uk, SI 2026/390 (EPC requirement removed)

Read on 3 November 2026. Rules and statistics change: if anything here disagrees with the official page, the official page is right. Tell us through the form and we will correct it.

Got a question about your own installation?

Describe the house and where you are in the process: no quote yet, a quote to make sense of, or a voucher already issued. The message goes to SEO-DONS LTD, the company that publishes this guide, and a reply comes back by email.

What happens next

  1. SEO-DONS LTD, the publisher of this guide, receives your message.
  2. We answer by email, using the official figures and rules this site is built on.
  3. You decide what to do next. Sending a question does not sign you up to anything.
Tell us more about the house (optional)

Your message is read by SEO-DONS LTD, publisher of Heat Pump and Installation, and answered by email. This site does not fit, survey or sell heat pumps and does not run any grant scheme. See our privacy notice.

Ask a question
Ask a question