After a boiler breakdown: getting a heat pump in time

A boiler that fails, especially in winter, turns a planned project into an urgent one. How the installation steps and the grant's deadlines fit around a breakdown, and where the risk sits.

Figures checked 3 November 2026Sources at the foot of the pagePublished by SEO-DONS LTD, an independent guide

A heat pump is easier to plan than to rush. The survey, the design and the grant application each take some time, and none of them can be skipped without a cost somewhere. But a breakdown does not rule a heat pump out. It means choosing between two routes, knowing what each one risks.

The two routes after a breakdown

Normal routeRetrospective route
When the grant is applied forBefore the workAfter commissioning, within 120 days
Your confirmation to OfgemWithin 14 days of its emailStill needed when the application is made
If the grant is refusedYou find out before work startsThe work is done; you pay the full price
Time without the heat pumpSurvey, design and approval firstShorter, if the installer can start at once

The normal route, done quickly

The normal route is the same as any installation: survey, design and quote, then the installer applies and you confirm when Ofgem emails you. The way to keep it quick is to remove your own delays. Answer Ofgem's email the day it arrives rather than near the end of the 14 days. Agree the cylinder position and the outdoor unit's spot at the survey. Check early whether the unit meets the planning conditions, because an application would add weeks. Once the voucher is issued, the installer has 3 months to finish an air source job, so there is no reason for the fitting itself to wait.

The installation planner shows the dates that follow from the month you accept a quote.

The retrospective route

The scheme lets an installation go ahead first and the grant be applied for afterwards, as long as the application is properly made within 120 days of commissioning. That is the route people consider after a breakdown, because the heating comes back sooner.

Ofgem's guidance is plain that this carries extra risk for the owner. If the application is refused, for example because something about the property or the installation does not meet the rules, the grant is not paid and you are left with the full cost. At the July to September 2026 median, that is the difference between paying £12,826 and about £5,326. Only the installer can ask Ofgem to review a refusal, within 28 days.

If you take this route, ask the installer before work starts, in writing: what happens to the price if the grant is refused? Some will have a view on how likely a refusal is for your home; none can guarantee the outcome.

Staying warm in the meantime

Where the normal route is chosen, the gap is usually bridged with temporary heating, such as electric heaters, and hot water from an electric immersion heater if the home already has a cylinder. These are expensive to run for long, so the aim is to keep the gap short: answer Ofgem quickly and agree the fitting date as soon as the voucher is issued. Another option some people use is a repair to the old boiler to buy time, where a repair is possible and safe.

Deciding

The choice comes down to how long you can manage with temporary heat, and how much of the grant you are prepared to put at risk. A short wait on the normal route keeps the grant decision ahead of the spending. The retrospective route brings the heating back sooner but moves the risk of refusal onto you. Whichever you choose, the survey still matters: a heat pump sized in a hurry is a heat pump that may not keep the house warm. The survey page explains what it should cover, and the installation stages page shows the normal order.

Breakdown questions

My boiler has failed in winter. Is a heat pump realistic?

It can be, but it is rarely as quick as a boiler swap, because a heat pump needs a survey and a design first and the grant has its own steps. Many people put temporary heating in place while the survey, the application and the 14-day consent window run.

Can I have the heat pump fitted now and claim the grant later?

The scheme allows a retrospective application, properly made within 120 days of commissioning. Ofgem's guidance warns that the owner carries extra risk on this route: if the application is refused, there is no grant. Get the installer's position on that risk in writing before work starts.

Does a broken boiler change the grant amount?

No. The grant is £7,500 for most homes replacing fossil fuel or electric heating, whether the old system works or not, as long as you own the property and an MCS certified installer applies.

Where this page's figures come from

  1. Ofgem, Boiler Upgrade Scheme for property owners
  2. Ofgem, property owner guidance v5.1 (PDF)
  3. GOV.UK, Boiler Upgrade Scheme: how to apply
  4. DESNZ, Boiler Upgrade Scheme statistics September 2026

Read on 3 November 2026. Rules and statistics change: if anything here disagrees with the official page, the official page is right. Tell us through the form and we will correct it.

Got a question about your own installation?

Describe the house and where you are in the process: no quote yet, a quote to make sense of, or a voucher already issued. The message goes to SEO-DONS LTD, the company that publishes this guide, and a reply comes back by email.

What happens next

  1. SEO-DONS LTD, the publisher of this guide, receives your message.
  2. We answer by email, using the official figures and rules this site is built on.
  3. You decide what to do next. Sending a question does not sign you up to anything.
Tell us more about the house (optional)

Your message is read by SEO-DONS LTD, publisher of Heat Pump and Installation, and answered by email. This site does not fit, survey or sell heat pumps and does not run any grant scheme. See our privacy notice.

Ask a question
Ask a question