Heat pump installation checklist

25 things to have, check or diary across an installation, in the order they come up. Print it, or tick it off on screen.

Figures checked 3 November 2026Sources at the foot of the pagePublished by SEO-DONS LTD, an independent guide

A heat pump installation has more paperwork and more decisions than a boiler swap, spread over weeks or months. This checklist puts them in order. Nothing on it is a test of the installer; it is what a well-run project produces anyway, so a good installer will expect you to ask.

Before the survey

After the survey, before accepting a quote

When the grant is applied for

During the fitting

At commissioning and handover

0 of 25 ticked

What each group of items protects

The survey figures protect the price

The heat-loss figures, the size in kW, the flow temperature and the radiator schedule are the job being priced. With them in writing, a second installer can quote for the same job, and any later change to the design has to be explained. Without them, two quotes may be for different systems and you cannot tell.

The siting items protect against delay

The unit's position, the sound calculation and the planning position decide whether an application is needed. Finding that out after the voucher is issued eats into its 3 months; finding it out at the survey costs nothing.

The grant dates protect the grant

The 14-day consent window and the voucher's end date are the two points where a missed email or a slipped schedule can cost the grant. Both are easy to diary and hard to recover once passed.

The handover papers protect the future

The certificate, records and warranties are what a buyer, an engineer or a warranty claim will ask for. Collecting them on the day is far easier than chasing them a year later.

Why each stage matters

The first two stages decide the price and the design, so they matter most: once you have accepted a quote, the installer applies for the grant and the clock starts. The middle stages are about not missing a date, the 14 days to confirm and the voucher's deadline. The last stage is about holding the evidence you will need later, when you sell the house or call an engineer. The installation stages page explains the order, and the planner works out your own dates.

Using it with an installer

It can help to send the second section to each installer before their survey visit, so they know which figures you will ask for. Installers who already produce a full design pack will have most of it ready; the gaps tell you something too. Keep a copy of each installer's answers alongside their quote, so that when you compare prices you are comparing the same list of work.

Ticks are kept only in your own browser and are not sent anywhere.

Keep the finished list with the commissioning certificate and the MCS paperwork: it is a quick record of what was agreed, and when, if a question about the job comes up later.

Where this page's figures come from

  1. Ofgem, Boiler Upgrade Scheme for property owners
  2. legislation.gov.uk, permitted development Class G
  3. MCS, notifying DNOs
  4. GOV.UK, competent person schemes

Read on 3 November 2026. Rules and statistics change: if anything here disagrees with the official page, the official page is right. Tell us through the form and we will correct it.

Got a question about your own installation?

Describe the house and where you are in the process: no quote yet, a quote to make sense of, or a voucher already issued. The message goes to SEO-DONS LTD, the company that publishes this guide, and a reply comes back by email.

What happens next

  1. SEO-DONS LTD, the publisher of this guide, receives your message.
  2. We answer by email, using the official figures and rules this site is built on.
  3. You decide what to do next. Sending a question does not sign you up to anything.
Tell us more about the house (optional)

Your message is read by SEO-DONS LTD, publisher of Heat Pump and Installation, and answered by email. This site does not fit, survey or sell heat pumps and does not run any grant scheme. See our privacy notice.

Ask a question
Ask a question