- Air source heat pump
- A heat pump that takes heat from the outside air through an outdoor unit and uses it to warm water for radiators and taps. Also called air-to-water. Read more
- Boiler Upgrade Scheme
- The grant for heat pumps in England and Wales, run by Ofgem. £7,500 for most air source and ground source installations, taken off the installer's price. Read more
- Buffer tank
- A small store of heating water between the heat pump and the radiators that some designs use to smooth how the system runs. Read more
- Class C
- The permitted development class in England for ground source heat pumps within the grounds of a house or block of flats. Read more
- Class G
- The permitted development class in England for air source heat pumps: outdoor unit up to 1.5 m³ on a house, 0.6 m³ on a block of flats, plus siting and sound conditions. Read more
- Commissioning
- The documented switch-on: filling, testing and setting up the system, with the readings recorded. Read more
- Competent person scheme
- A government-authorised scheme that lets registered installers self-certify building work instead of applying to building control. Read more
- Connect and notify
- The route where the installer connects the heat pump and then tells the network operator within 28 days, used when the home's new maximum demand is 60A or less and other conditions are met. Read more
- Consent (owner confirmation)
- The step where the property owner confirms to Ofgem, within 14 days of its email, that the installer is applying on their behalf. Read more
- Consumer code
- A code of practice an installer belongs to, with standards and a complaints route. Ofgem lists HIES, RECC and MCS for the grant scheme. Read more
- Cylinder
- The insulated tank that stores hot water for taps and showers. Most heat pump systems need one. Read more
- Design flow temperature
- The temperature of the water the system is designed to send to the radiators on the coldest day. Lower generally means more efficient, but may need larger radiators. Read more
- DNO (network operator)
- The company that runs the local electricity cables, different from the supplier that bills you. Read more
- Emitters
- Whatever releases the heat into rooms: radiators, underfloor heating or fan convectors. Read more
- Ground loop
- The sealed pipe buried in trenches or boreholes that collects heat for a ground source heat pump. Read more
- Heat-loss calculation
- The room-by-room estimate of the heat a home loses on a cold day, which sizes the heat pump and the radiators. Read more
- Hybrid system
- A heat pump working alongside a boiler. Hybrids are not funded by the Boiler Upgrade Scheme. Read more
- kW and kWth
- Kilowatts, the unit for a heat pump's heat output. kWth (kilowatts thermal) is used in the grant rules, which cap individual systems at 45 kWth. Read more
- Maximum demand
- The most electricity a home could draw at once. Adding a heat pump raises it, which decides how the network operator is told. Read more
- MCS
- The Microgeneration Certification Scheme. The grant requires an MCS certified installer, and certification is for each technology. Read more
- MCS 020 a)
- The MCS sound calculation for air source heat pumps installed under permitted development in England. Read more
- MIS 3005-D
- The MCS heat pump design standard that certified installers design to. Read more
- Permitted development
- Work allowed without a planning application, provided every condition in the rules is met. Read more
- Redemption
- The installer claiming the grant voucher from Ofgem after commissioning. Read more
- Retrospective application
- A grant application made after the heat pump is fitted. It must be properly made within 120 days of commissioning, and the risk of refusal is the owner's. Read more
- Unvented cylinder
- A hot water cylinder fed directly from the mains rather than from a tank in the loft. Installing one is building work under the regulations. Read more
- Voucher
- The grant as approved by Ofgem in the installer's name. It runs for 3 months for air source and 6 months for ground source. Read more
- Weather compensation
- A control that lowers or raises the flow temperature as the outside temperature changes. Read more
Missing a term? Send it through the form below and we will add it.