Accessibility

We want everyone to be able to read this guide and use its tools. This page says what we have done, what we know is not yet right, and how to tell us about a problem.

What the site does

The interactive parts

Two parts of the site respond to input. The stage walkthrough on the home page uses real buttons for each stage, announces "Stage 2 of 4" and similar to screen readers, and moves focus to the stage you choose. The installation planner on the cost page uses standard form controls with labels, updates its results in a region that screen readers announce, and shows a full table of every size band that can be read without using the planner at all. The printable checklist uses ordinary checkboxes and keeps your ticks only in your own browser.

Tables and figures

Price tables have column and row headings so they read in order, and wide tables scroll sideways on small screens instead of squeezing their text. Where a chart shows prices, the same prices appear in the text or a table on that page.

Known gaps

Some diagrams carry a lot of text as part of the image; where that happens, the same information is in the page text. If you find a page where it is not, please tell us.

Reporting a problem

Use the form below. Say which page and what happened, and if you use assistive technology, which one. SEO-DONS LTD reads every message and replies by email.

Report an accessibility problem

Tell us the page and what got in the way. The message reaches SEO-DONS LTD and we reply by email.

What happens next

  1. SEO-DONS LTD, the publisher of this guide, receives your message.
  2. We answer by email, using the official figures and rules this site is built on.
  3. You decide what to do next. Sending a question does not sign you up to anything.
Tell us more about the house (optional)

Your message is read by SEO-DONS LTD, publisher of Heat Pump and Installation, and answered by email. This site does not fit, survey or sell heat pumps and does not run any grant scheme. See our privacy notice.

Ask a question
Ask a question